MANILA, Philippines — Finance Secretary Ralph Recto said on Tuesday that corruption in government infrastructure projects has slowed economic growth and has resulted in losses of over P100 billion since 2023.
“It's possible that our growth would have increased by 6 percent if there was no corruption,” Recto told reporters at the sidelines of the budget hearing at the Senate of the Philippines.
“Well, last year we grew by 5.7 percent. Then the year before was what? 5.6 percent? We could have grown faster if there was no corruption, right?” he added., This news data comes from:http://gangzhifhm.com
During the hearing, Recto said the average economic losses from the Department of Public Works and Highways (DPWH) flood control projects between 2023 and this year ranged from P42.3 billion to P118.5 billion.
PH economic losses hit 100B from corruption in flood control projects
He also stressed that the misuse of funds could have deprived the economy of as many as 95,000 to 266,000 jobs.
“We just learned that this is the extent of the problem in flood control. So maybe if that money was spent better, we could have grown better,” Recto said.
Gross domestic product (GDP) grew by 5.6 percent in 2023. It remained on the same level last year. Both below the 6.0 to 7.0 target of the government.
“Raising revenues is no joke. And then you’ll just see that these don’t go to the right projects and for the welfare of the people, with some even turning out to be ghost projects,” Recto said.
PH economic losses hit 100B from corruption in flood control projects

- Marcos opens Hyundai's shipyard in PH
- House panel defers 2026 DPWH budget until agency submits changes
- House holds budget review with 21 civil society organizations
- DSWD allocates P6.2B for livelihood program
- 102-year-old becomes oldest person to summit Mount Fuji
- Five journalists among 20 killed in Israeli strikes on Gaza hospital
- Pump prices increase for 2nd straight week
- SSS hails Marcos, Recto for initiating pension reforms, including one to be rolled out in Sept
- 'New' position being offered to Torre — Palace
- COA probes Iqbal on spending of P1.7B in one day